Large industrial oil and gas refinery complex with stacks and processing unitsOil and gas refinery complex

Key Takeaways:

  • Electrification of offshore oil and gas platforms using power from onshore renewable grids is the single most impactful decarbonisation lever available to North Sea and Norwegian operators, capable of eliminating Scope 1 emissions from power generation on connected installations.
  • Norway’s Electrification Masterplan envisions connecting over 20 offshore installations to onshore power by the early 2030s, reducing Norwegian offshore CO2 emissions by several million tonnes per year.
  • High-voltage subsea power cables and transformer systems capable of delivering grid power to remote deepwater installations present significant engineering challenges, including cable reliability, reactive power compensation, and protection system design.

The Electrification Imperative for Offshore Oil and Gas

The offshore oil and gas industry’s carbon footprint is dominated, on a per-barrel basis, by the power consumed on platforms for compression, pumping, drilling, and accommodation services. On a typical offshore installation in the North Sea or Norwegian sector, that power is generated by gas turbines burning the field’s own produced gas — an efficient and reliable arrangement from an operational standpoint, but one that generates substantial CO2 emissions. For every megawatt-hour of electricity generated by a gas turbine, approximately 0.4 to 0.6 tonnes of CO2 is released. For a large installation consuming 60 to 100 megawatts of electrical power continuously, this represents 200,000 to 400,000 tonnes of CO2 per year from power generation alone.

In a regulatory environment where the Norwegian Petroleum Directorate (now Offshore Energy Directorate, OED) and the UK’s NSTA are imposing increasingly stringent requirements on offshore operators to reduce their greenhouse gas intensity, and where the carbon price under the EU Emissions Trading Scheme (ETS) and the UK ETS has risen to levels that make CO2 emissions financially material, the economic case for electrification has shifted from marginal to compelling for many installations. When offshore power generation emitting 500g CO2/kWh is replaced by onshore grid power drawing from renewable sources at effectively zero carbon intensity, the emissions benefit is immediate, substantial, and directly auditable.

Norway’s Electrification Programme: A Global Blueprint

Norway’s approach to offshore electrification has been the most ambitious and systematic in the world, driven by a combination of regulatory pressure through the CO2 tax on offshore emissions — currently among the highest in the world at approximately NOK 1,100 per tonne — and the availability of Norway’s largely hydroelectric onshore grid, which provides clean baseload power at reasonable cost. Norwegian offshore emissions account for approximately 14 million tonnes of CO2 per year, representing about 25% of Norway’s total national emissions, making offshore electrification a central plank of Norway’s climate policy.

Equinor has led electrification investment, with the Troll A platform’s electrification in 1996 — one of the world’s earliest examples of offshore power from shore — demonstrating the technical viability of the concept decades before it became a climate imperative. More recent examples include the Edvard Grieg and Ivar Aasen platforms, connected to the Haugsneset power-from-shore facility via a 68-kilometre subsea cable delivering 56 MW of onshore power, and the Johan Sverdrup field’s first-of-a-kind Utsira High power-from-shore cable that delivers 100 MW from onshore, electrifying the entire Johan Sverdrup complex and eliminating the equivalent of approximately 470,000 tonnes of CO2 per year.

The OED’s Electrification Masterplan, published in collaboration with the industry, identifies a pipeline of additional electrification projects targeting installations in the Utsira High area, Tampen area (where the Tampen Link project will connect Snorre and Gullfaks to onshore power), and potentially the Barents Sea in the longer term. The Tampen Link — delivered in 2023 after years of planning, engineering, and permitting — is the world’s most powerful offshore electrification project to date, delivering up to 88 MW of onshore power to five platforms simultaneously and reducing CO2 emissions by approximately 200,000 tonnes per year.

UK North Sea Electrification: A Different Challenge

The UK North Sea electrification challenge differs from Norway’s in several important respects. The UK’s onshore grid is considerably more carbon-intensive than Norway’s hydroelectric grid, though it is progressively decarbonising as offshore wind capacity expands. Many UK installations are older, smaller, and more geographically dispersed than the Norwegian clusters that lend themselves to shared infrastructure. And the UK fiscal regime for offshore investment — including the Energy Profits Levy (EPL) and the existing Ring Fence Corporation Tax (RFCT) — creates complex incentive structures that affect the economics of large capital projects like electrification cables.

Despite these challenges, several UK operators have developed or are progressing electrification concepts. The Northern Endurance Partnership — a carbon capture and storage project involving bp, Equinor, and Total Energies targeting the Humber industrial cluster — is developing offshore infrastructure that includes power supply arrangements relevant to electrification. Harbour Energy has explored power-from-shore options for its Central North Sea assets. And the broader NSTA Electrification Guidance, published to provide a framework for assessing electrification projects in the UK licensing regime, signals regulatory appetite for emissions reduction through offshore power from shore.

The economics of UK offshore electrification are challenging. A subsea power cable of the specification required — high-voltage (typically 132 kV or above), with transformer capacity, switchgear, and all associated topside modifications — represents a capital expenditure of hundreds of millions of pounds for a project serving a cluster of platforms in the Central or Northern North Sea. For ageing assets with limited remaining production life, the carbon savings may not justify the capital investment; for major hubs with long production horizons, the business case is considerably stronger, particularly if the UK ETS carbon price continues to rise.

Subsea Power Technology: Cables, Transformers, and Variable Speed Drives

Delivering grid power to an offshore installation requires more than simply extending an onshore cable into the sea. The technical challenges of long-distance subsea power transmission include reactive power management — the same challenge that affects long-distance HVAC cable transmission in offshore wind — and voltage regulation over variable loads. Offshore platforms have highly variable power demands, cycling between high-load periods when major compression trains are running and lower-load periods during maintenance or reduced production. This variability imposes requirements on the onshore supply system and on any reactive power compensation equipment located offshore.

Subsea power transformer technology — in which transformer units are located on the seabed rather than on the topside, reducing the weight of electrical equipment that must be accommodated on the platform — has advanced significantly in recent years, with ABB (now Hitachi Energy) and Siemens Energy both developing qualified subsea transformer products. Subsea transformers step up or step down voltage at the seabed, allowing long-distance cable runs at high voltage (where transmission losses are lower) with local conversion to the platform’s distribution voltage level. The qualification of subsea power equipment requires demonstrating reliable operation in the high-pressure, low-temperature, and corrosive seabed environment over the 25-year or longer field life — a demanding set of conditions that has limited the deployment of subsea power components to projects where topside weight constraints or long cable run economics justify the technology.

Variable speed drives (VSDs) for offshore compression and pumping applications are a complementary technology that reduces overall power demand and improves system efficiency. A conventional fixed-speed motor driving a compressor or pump operates at constant speed regardless of the actual compression or pumping requirement, leading to significant energy waste at partial loads. VSDs — which electronically control motor speed to match the required output — can reduce power consumption by 30–50% in variable-load applications, directly reducing the size of the power supply cable required and the associated offshore emissions. Equinor’s Åsgard subsea compression station, which uses the most powerful subsea electric motors ever deployed (12.5 MW each), demonstrates the feasibility of major subsea motor-driven equipment at commercial scale.

Floating Wind as an Offshore Power Source

An emerging alternative to power-from-shore electrification is the direct supply of power from floating offshore wind to oil and gas installations in locations where shore connection is not economic or technically feasible due to distance. The concept is most actively being developed in Norway, where Equinor’s Hywind Tampen project — the world’s first floating wind farm to supply power to offshore oil and gas installations — is delivering up to 88 MW of renewable power to the Snorre A and B and Gullfaks A, B, and C platforms in the Norwegian North Sea. Commissioned in late 2023, Hywind Tampen represents a significant milestone in both floating wind and offshore electrification, demonstrating that floating turbines can supply reliable power to demanding offshore industrial facilities.

The Hywind Tampen project uses eleven Hywind floating turbines on spar-buoy foundations, connected to the platforms via a dedicated power cable. The wind farm operates in water depths of 260–300 metres, where conventional bottom-fixed foundations would not be technically or economically feasible. Wind intermittency — the variability of wind power output — is managed by the gas turbine backup capacity on the platforms, which provides flexible supplementary power when wind output is insufficient. Over a full year of operation, Hywind Tampen is estimated to reduce CO2 emissions from the connected platforms by approximately 200,000 tonnes per year, equivalent to approximately 35% of the installations’ combined emissions.

The Economics and Policy Framework for Offshore Electrification

The economics of offshore electrification projects depend critically on the carbon price, the cost of onshore grid power, the cost of gas turbine fuel (i.e., the opportunity cost of burning produced gas that could otherwise be exported), the capital cost of the electrification infrastructure, and the remaining production life and output profile of the installations to be electrified. At carbon prices above NOK 1,000 per tonne — the approximate current Norwegian level — and with gas prices at levels seen in 2022–2024, the economics of electrification for large Norwegian installations with long production lives are clearly positive.

In the UK, where carbon pricing is lower and grid power more expensive, the business case is more challenging. The UK government’s response has included investment allowances within the Offshore Decarbonisation Obligation consultation process and the broader 2050 Net Zero commitment, which creates a regulatory expectation that operators will progressively reduce their offshore emissions. Whether this regulatory framework will translate into mandatory electrification requirements for major UK installations — as Norway’s CO2 tax has effectively done — remains an open policy question, but the direction of travel is clear.

Offshore electrification is not a silver bullet for the oil and gas industry’s decarbonisation challenge. It addresses only the power generation component of offshore emissions, leaving process-related CO2 (from venting and flaring, and from the combustion inherent in certain process operations) and the far larger Scope 3 emissions from the combustion of the produced hydrocarbons by end customers, untouched. But within the scope of what operators can control — Scope 1 and Scope 2 emissions — offshore electrification is one of the most effective and scalable interventions available, and its deployment across the North Sea and Norwegian sector in the coming decade will be one of the defining stories of the energy transition’s industrial dimension.