- Aramco and ADNOC account for a majority of incremental jackup demand through 2027
- North Sea jackups have tightened from 2024 lows as UK activity ticked up post-windfall tax easing
- Cold-stacked units are returning slower than expected — crewing, not steel, is the constraint
Segment Overview
Jackups are the workhorse of shallow-water drilling. Roughly 500 units are marketed globally, with around 380 actively contracted at any given time. Unlike the floater market, the jackup fleet has continued to renew through the 2020s, with a pipeline of newbuilds delivering primarily to Middle Eastern yards and clients. The jackup market is also more geographically segmented than floaters — a high-spec harsh-environment North Sea jackup isn’t going to compete with a benign-environment Gulf of Suez unit.
North Sea Dynamics
The UKCS jackup market saw a serious dip through 2023-2024 as the windfall tax and investment climate bit into operator activity. By early 2026, activity has picked up meaningfully — rates for premium harsh-environment jackups have returned to $180-220k per day, and utilisation is back in the 85%+ range. Norwegian sector remains tighter as Aker BP, Equinor, and others execute sanctioned development campaigns.
Middle East: The Demand Engine
Saudi Aramco’s unconventional gas drive and ADNOC’s offshore expansion dominate incremental jackup demand. Combined, the two have contracted additions measured in dozens of units since 2022. The contracts are multi-year and sticky. Rig rates in the Arabian Gulf have not climbed as fast as the North Sea or GoM premium rates because supply is being added specifically for this market, but utilisation is high.
Southeast Asia and China
Indonesia, Malaysia, Thailand, and Vietnam represent a large, fragmented market with chronic below-$120k rates and lower operating standards than Western basins. Chinese offshore (Bohai Bay, South China Sea) is heavily served by domestic Chinese rigs — COSL and its peers dominate a market that’s effectively closed to external competition.
The Mexican and Gulf of Mexico Shallow Water
Pemex has been a major but volatile jackup client. Payment issues in 2023-2024 pushed several contractors to exit the Mexican market; activity has since resumed but with shorter terms and more conservative credit terms. The US Gulf shallow-water market is modest — most drilling moved to deepwater decades ago.
Newbuilds vs Upgrades
New jackup deliveries in 2026-2027 are running 8-12 units per year, primarily from Chinese and Middle Eastern yards. Most are committed to specific operator contracts before launch. The upgrade market (raising leg length, adding 15k psi BOP, upgrading living quarters) has been active — a refurbished 2005 jackup with upgraded capability can compete with a newbuild at a fraction of the cost.
Crew Availability as Constraint
A recurring theme across all regions is that stacked rigs can be reactivated physically but not operationally because crew have moved on. Reactivating a cold-stacked jackup needs 6-12 months of recommissioning, crew recruitment, and crew workup. This has slowed the supply response to higher rates and kept utilisation tighter than steel counts suggest.
Contract Duration Trends
Multi-year contracts are the norm in the Middle East, while North Sea and Asia still see more well-by-well or single-campaign deals. Average contract durations have ticked up as operators have prioritised rig certainty over flexibility. The bilateral contract is also increasingly accompanied by a priced option for extension.
Dayrate Outlook
Assuming no major oil price shock, jackup rates look range-bound through 2027 — modest upside in the North Sea and Middle East premium segments, flat to softer in benign environments where supply is being added. A demand shock (e.g. a sustained $90+ oil price pulling more US Gulf and African infill activity) could tighten premium supply quickly, but that’s a second-order scenario.
What Operators Should Be Doing
For shallow-water operators with multi-year programs, now is a reasonable time to lock in rig supply with multi-year terms at current rates. For single-well programs, the spot market remains accessible in most regions, though lead times for premium harsh-environment units have stretched to 4-6 months in some cases.

