- Guyana’s Stabroek Block — operated by ExxonMobil with partners Hess Corporation and CNOOC — has established itself as the most consequential deepwater oil province discovered this century, with gross recoverable resources now exceeding 11 billion oil-equivalent barrels across more than 45 discoveries and five FPSOs in production or under development.
- The Hammerhead FPSO, the fifth major development vessel at Stabroek, is targeting FID in 2025–2026 with a production capacity of up to 180,000 bbl/d, while exploration drilling continues to extend the resource base southward and into deeper water depths approaching 3,000 metres.
- Guyana’s rapid ascent to 750,000 bbl/d of production — and trajectory toward 1.2 million bbl/d by 2028 — has fundamentally altered the Caribbean’s geopolitical energy landscape and triggered a re-evaluation of how quickly new deepwater provinces can be commercialised under the right fiscal and regulatory conditions.
Stabroek: The Basin That Rewrote the Rules
ExxonMobil’s 2015 discovery of Liza on Block 2 of the Stabroek licence offshore Guyana did not immediately register as the industry-defining find it turned out to be. Initial resource estimates were cautious — as they tend to be on first-well results — and Guyana in 2015 was not a country with much offshore infrastructure, regulatory track record, or established supply chain. The country had no commercial oil production at all. Fast-forward to 2026, and Guyana is producing north of 750,000 barrels of oil per day from FPSOs Liza Destiny, Liza Unity, Prosperity, and the recently sanctioned Hammerhead project in development, with a trajectory that has serious analysts discussing one million barrels per day before 2030. It is, by any reasonable measure, one of the most remarkable basin development stories of the past 20 years.
The Stabroek Block is large — approximately 6.6 million acres offshore Guyana — and the petroleum system, sourced from Cretaceous-age organic-rich shales, has proved both extensive and prolific. Reservoirs are predominantly turbidite sandstones of excellent quality, with porosity and permeability characteristics that, combined with API gravity in the 26 to 34-degree range, produce strong well flow rates at subsea conditions that translate efficiently to surface production. The block has now seen more than 45 commercial discovery announcements, and the exploration programme continues to identify new structures along the basin’s southern and western margins.
The FPSO Fleet: From Liza Destiny to Hammerhead
The development strategy at Stabroek has been FPSO-centric from the start — a logical approach for a remote deepwater province in 1,500 to 2,000 metres of water, far from any existing processing infrastructure. The first vessel, Liza Destiny, produced first oil in December 2019, ahead of the original schedule and under budget by industry standards for a first-of-basin deepwater FPSO development. Liza Unity followed in February 2022, with a capacity of 220,000 bbl/d and the added wrinkle of an FPSO gas injection system designed to meet Guyana’s strict zero routine flaring commitment — a feature that required subsea reinject ion wells and associated gas handling infrastructure that added complexity but burnished the project’s environmental credentials.
The Prosperity FPSO, assigned to the Payara development with a capacity of 220,000 bbl/d, came online in late 2023 and represents the third major production vessel in what is essentially a sequential FPSO string. Each successive vessel has incorporated lessons from its predecessor in terms of subsea layout optimisation, riser design, processing train performance, and safety systems. ExxonMobil’s project execution capability — building on its deepwater Gulf of Mexico experience and FPSO development track record — has been central to the Stabroek programme’s remarkable schedule performance.
The Yellowtail development, assigned the One Guyana FPSO (capacity 250,000 bbl/d), is the fourth major project and pushed into execution in 2024. Yellowtail develops the large Yellowtail-Redtail accumulation in the southern part of Stabroek, using a more complex subsea architecture than earlier projects due to greater reservoir heterogeneity and depth variation. The One Guyana FPSO, built at the Sembcorp Marine yards in Singapore, incorporates state-of-the-art gas compression, water injection, and produced water treatment capabilities.
Hammerhead: The Next FPSO and the FID Decision
The Hammerhead development represents ExxonMobil and its partners’ fifth major FPSO at Stabroek, targeting a high-quality accumulation in the northwestern area of the block. Hammerhead gross resources are estimated at approximately 800 million barrels of recoverable oil, supporting an FPSO with capacity of approximately 180,000 bbl/d. The development concept involves a purpose-built FPSO with an ambitious target of maintaining Guyana’s zero routine flaring commitment through full gas reinject ion and fuel gas utilisation.
FID for Hammerhead has been subject to timing discussions, with ExxonMobil management signalling a decision within the 2025 to 2026 window. The primary variables are oil price (ExxonMobil’s investment threshold for deepwater Stabroek projects is reportedly in the $35 to $45/bbl breakeven range at plateau production, well below current market prices), fiscal terms confirmation with the Guyanese government, and FPSO yard slot availability — a constraint that has lengthened with the global FPSO orderbook congestion. The project has proceeded through FEED, and early procurement actions suggest a positive FID is expected.
The Hess Corporation Wild Card: ExxonMobil’s Acquisition Bid
The Stabroek story became considerably more complex in late 2023 when Chevron announced its agreement to acquire Hess Corporation — which holds a 30% non-operated working interest in Stabroek — in an all-stock transaction valued at approximately $53 billion. The deal would, if completed, give Chevron a major stake in the world’s most prolific developing deepwater basin and a platform for material production growth through the late 2020s and 2030s.
However, ExxonMobil and CNOOC (the third Stabroek partner, with 25% working interest) exercised right-of-first-refusal (ROFR) clauses in the Stabroek joint operating agreement, claiming that the Chevron-Hess merger constituted a deemed transfer of Hess’s Stabroek interest and triggering their right to acquire that interest at the transaction value price. This legal dispute went to arbitration and created significant uncertainty around the deal’s timeline and ultimate structure. The resolution — and the implications for Chevron’s global deepwater strategy and ExxonMobil’s Stabroek control — represents one of the most significant M&A stories in the offshore industry in years.
Guyana’s Government Take and the PPP’s Fiscal Strategy
Guyana’s production sharing agreement (PSA) with ExxonMobil, Hess, and CNOOC — the terms of which were publicly disclosed and extensively analysed following the country’s first oil production — has been a subject of significant domestic and international debate. The original Stabroek PSA, signed in 1999 and amended in 2016, provides for cost recovery of up to 75% of production before government profit oil takes effect, with royalties and profit oil splits that some Guyanese civil society organisations and independent analysts have described as insufficiently favourable to the host country relative to the size of the discovery.
The People’s Progressive Party (PPP) government, which has governed Guyana since 2020, has taken a pragmatic approach to the Stabroek fiscal terms — maintaining the existing PSA while pursuing higher government take on new licensing rounds and building out the Guyanese National Oil Company (GNPC) Guyana’s capacity to potentially take a carried working interest in future developments. The government’s stated ambition of using oil revenues to fund infrastructure, education, and economic diversification is being implemented through a sovereign wealth fund — the Natural Resource Fund — though the pace of drawdown and the governance of that fund have been subjects of ongoing political debate.
Beyond Stabroek: The Wider Guyana-Suriname Basin
Stabroek’s success catalysed exploration across the wider Guyana-Suriname geological province, which extends from Venezuelan waters southward into Suriname and further into Brazil’s Foz do Amazonas basin. In Suriname, TotalEnergies and APA Corporation (formerly Apache) have made material discoveries on Block 58, with the Sapakara West, Kwaskwasi, and Keskesi East wells confirming a working petroleum system and commercial resource base that is now advancing through pre-FEED. A Suriname FPSO development could add another 100,000 to 150,000 bbl/d to the wider regional production picture in the early 2030s.
In Brazil’s Foz do Amazonas basin — which lies adjacent to the Guyana-Suriname play and shares similar Cretaceous fan reservoir systems — exploration drilling has been more cautious due to proximity to the Amazon River delta, environmental sensitivity, and the complex regulatory requirements of IBAMA (Brazil’s environmental agency). But the petroleum system is real, and the basin remains a prospective long-term frontier with material potential if exploration results justify development.
Supply Chain Impact: Guyana’s Growing Footprint
The rapid development of Stabroek has placed significant demands on the global deepwater supply chain. ExxonMobil’s ability to execute five large-scale FPSO projects in sequence, maintaining schedule discipline and cost performance across each, has required a highly organised approach to procurement, fabrication management, and offshore installation. Subsea contractors including TechnipFMC, Subsea 7, and Saipem have all executed major SURF scopes at Stabroek. Drillships from transocean and Valaris have executed development drilling campaigns. The scale of activity has been such that Guyana now features in the deployment plans of most major deepwater contractors as a significant and ongoing work location.
The Guyanese government’s local content aspirations — building a domestic supply chain for training, logistics, catering, fabrication, and eventually higher-value services — are ambitious but constrained by the country’s small population and limited pre-existing industrial base. Progress has been made in some areas (workforce training, logistics, port facilities), but the high-value engineering, subsea construction, and FPSO fabrication and integration work is overwhelmingly performed outside Guyana. This is a long-term development challenge that is likely to take a generation to materially change, even with sustained political commitment and IOC cooperation.
Guyana at a Million Barrels: What It Means for Global Supply
Guyana’s trajectory toward one million barrels per day of production — currently projected around 2027 to 2028 — would make the country the seventh-largest oil producer in the Western Hemisphere, ahead of Ecuador, Colombia, and Argentina. It would also make Guyana one of the fastest-growing oil producers in the world, with production having grown from zero to a million barrels in approximately a decade — a pace that few countries have achieved in the modern era.
For the global oil supply balance, Guyana’s contribution is material: a million barrels per day is equivalent to roughly 1% of global oil demand, and at a time when OPEC+ is managing production carefully to maintain price support, Guyana’s continued ramp-up is one of the non-OPEC growth drivers that will increasingly weigh on the supply side of the market. ExxonMobil’s low breakeven costs at Stabroek mean Guyana production will continue regardless of whether oil prices are at $60 or $90/bbl. That makes it a reliable contributor to global supply — and a continued source of revenue growth for an IOC that has bet heavily on its Guyana position as a core long-term asset.

