Key Takeaways:
- Floating LNG (FLNG) vessels — which produce, liquefy, store, and offload LNG directly from a moored offshore facility — enable the monetisation of remote and stranded gas fields that would be uneconomic to develop via onshore pipeline and liquefaction infrastructure.
- Shell’s Prelude FLNG off Western Australia — at 488 metres in length and 600,000 tonnes displacement the largest floating structure ever built — represents the most technically complex and capital-intensive FLNG development to date, with lessons learned from its construction and operation shaping subsequent projects.
- The compact FLNG concept — pioneered by Eni’s Coral Sul FLNG in Mozambique — uses a smaller, more standardised vessel design that is more cost-effective for moderate-reserve gas fields and has demonstrated the commercial viability of FLNG at a scale replicable across multiple offshore basins.
The FLNG Concept: Monetising Stranded Offshore Gas
The liquefaction of natural gas into LNG — cooling it to -162°C to reduce its volume by approximately 600:1 — has historically been accomplished exclusively in large onshore liquefaction plants located near the wellhead or connected to it by pipeline. The onshore model works well when the gas field is close to a suitable coastline, when the environmental and social conditions allow a large industrial facility to be constructed, and when the reserves are large enough to justify the several-billion-dollar investment in a conventional liquefaction train. But many of the world’s undeveloped offshore gas fields fail one or more of these tests: they may be in remote deepwater locations where pipeline to shore is impractically long or expensive; they may be in environmentally or politically sensitive areas where onshore construction is contentious; or they may be of a size that makes conventional LNG development borderline economic.
The Floating LNG vessel — an FLNG — addresses these constraints by relocating the entire liquefaction process onto a moored vessel above the gas field. The FLNG receives raw wellhead gas via risers from the subsea production system below, processes it to remove condensate, water, CO2, and H2S, liquefies the residual gas in cryogenic heat exchangers cooled by a refrigerant cycle, stores the LNG in cryogenic tanks within the vessel’s hull, and periodically offloads it via cryogenic loading arms to a conventional LNG carrier moored alongside. The process is conceptually identical to an onshore liquefaction plant; the engineering challenge is compressing it into a space-constrained floating hull, making all components suitable for the marine environment and vessel motion, and providing the structural integrity, safety systems, and operational resilience required for safe operation at sea.
Shell Prelude: The World’s Largest Floating Structure
Shell’s Prelude FLNG — positioned above the Prelude gas condensate field approximately 475 kilometres north-northeast of Broome, Western Australia, in water depths of 250 metres — is the defining reference case for large-scale FLNG. Built at Samsung Heavy Industries in South Korea between 2012 and 2017 and achieving first LNG production in June 2019, Prelude is a vessel of extraordinary dimensions: 488 metres in length (longer than four football pitches end to end), 74 metres in beam, displacing approximately 600,000 tonnes when fully loaded — making it the largest floating structure in human history, displacing more than five times the mass of the largest aircraft carrier.
Prelude’s liquefaction system uses Shell’s proprietary PRICO (Propane Refrigerant Integrated Cycle Open) process — a simplified refrigerant cycle that reduces the number of refrigerant circuits required compared with the multi-train mixed refrigerant processes used in most large onshore LNG plants. The simplification is deliberate: reducing the complexity of the liquefaction process reduces the footprint, the weight, and — critically — the number of potential failure points in a system that must operate reliably in the marine environment with limited direct access for maintenance and repair. Prelude’s nameplate capacity is approximately 3.6 million tonnes per annum of LNG, plus associated condensate and LPG production.
The operational history of Prelude has been challenging. The vessel has experienced multiple unplanned shutdowns since achieving first gas, resulting from electrical faults, equipment trips, and the broader operational learning curve associated with being the first vessel of its kind ever operated anywhere in the world. These shutdowns have been commercially significant — the vessel’s production history from 2019 to 2023 was far below its nameplate capacity — and have raised questions among industry observers about the economics of the FLNG concept at the ultra-large scale represented by Prelude. Shell’s operational experience with Prelude has contributed enormously to the industry’s understanding of FLNG operations, but the path from first gas to sustained reliable production at capacity has been longer and more difficult than optimistic pre-production projections suggested.
Coral Sul FLNG: The Compact Model Proves Itself
Eni’s Coral Sul FLNG — moored above the Coral South gas field in Area 4 of the Mozambique Rovuma Basin in approximately 2,000 metres of water — represents a fundamentally different approach to FLNG. Where Prelude is a bespoke, ultra-large vessel developed at extraordinary capital cost for a specific super-giant field, Coral Sul is a purpose-designed compact FLNG using a more standardised concept aimed at moderate-reserve fields in the 2 to 8 million tonne per annum production capacity range. Built by Samsung Heavy Industries in partnership with a consortium of FLNG specialists and achieving first LNG in June 2022, Coral Sul produced the first deepwater FLNG LNG cargo from Africa.
Coral Sul’s liquefaction capacity is approximately 3.4 million tonnes per annum — similar to Prelude — but its vessel dimensions are significantly more compact: 432 metres in length compared with Prelude’s 488 metres, and with a design that places greater emphasis on standardisation and replicability. The compact FLNG concept has proven its commercial viability through Coral Sul’s operation; the vessel achieved relatively stable production from early in its operational life, reflecting both the lessons incorporated from Prelude’s experience and the benefits of a design that prioritises operability and maintainability alongside production capacity.
The commercial structure of Coral Sul — in which ENI led as operator with partners including ExxonMobil, CNPC, Galp, and KOGAS, under a long-term LNG offtake agreement with BP — demonstrates the financing model that makes FLNG viable for projects of this scale. Long-term offtake contracts providing revenue certainty, project finance structures with multilateral lending institution support, and appropriate risk allocation between the gas producer, the FLNG owner-operator, and the LNG buyer are all essential components of a bankable FLNG development. The Coral Sul structure provides a template for future compact FLNG projects in similar environments.
LNG Liquefaction Technology on FLNGs
The liquefaction of natural gas requires cooling the processed gas to -162°C, a temperature achievable only through multi-stage refrigerant cycles that progressively remove heat from the gas stream. Onshore LNG plants predominantly use one of three processes: the Propane Pre-cooled Mixed Refrigerant (C3MR) process developed by Air Products and used in most large-scale trains worldwide, the Shell-developed DMR (Dual Mixed Refrigerant) process used at some projects including the Qatargas trains, or the ConocoPhillips Optimized Cascade Process used at US LNG export facilities including Sabine Pass.
For FLNG applications, the liquefaction process must be adapted for the space and weight constraints of a floating hull and for the motion response of the vessel in waves and swell. Heat exchangers — particularly the large spiral-wound heat exchangers that are the heart of most LNG liquefaction processes — must be designed to function within the tilting and oscillating environment of a floating vessel. The refrigerant compressors — typically large centrifugal machines driven by gas turbines — must be suitable for installation on a floating platform. And the entire process must be designed with the additional safety margins appropriate to a marine environment where emergency response is more limited than for an onshore facility.
Linde Engineering’s LIMUM (Liquefaction in Modules) concept and TechnipFMC’s FLNG liquefaction technology are among the specialist process packages developed specifically for compact FLNG applications. These designs prioritise modularisation, weight reduction, and motion tolerance, using coil-wound heat exchangers (CWHE) of compact dimensions that can be fabricated and tested onshore before integration into the FLNG hull. The development of proven, compact liquefaction technology suitable for FLNG is one of the key enablers of the compact FLNG model and a significant competitive differentiator for the technology licensors.
Future FLNG Projects: Tanzania, Canada, and the Philippines
The FLNG concept’s proven commercial viability at Coral Sul has generated interest in its application across multiple new basins and projects. In Tanzania, the deepwater gas discoveries of Equinor and Shell are being evaluated against FLNG concepts as well as onshore liquefaction alternatives — FLNG potentially offering a faster route to first gas and avoiding the significant environmental and land acquisition challenges associated with onshore LNG plant construction in Tanzanian coastal areas. In Canada, the LNG Canada Phase 2 and potential floating LNG projects off the British Columbia coast are being studied as complements to or alternatives to the large onshore capacity being built at Kitimat.
The Philippines’ Tangguh and Browse Basin FLNG proposals in Australia — including Woodside’s potential Browse FLNG development — represent significant potential additions to the FLNG project pipeline. Browse, located approximately 425 kilometres north of Broome and containing an estimated 15-plus trillion cubic feet of gas resources, has been the subject of FLNG development studies for many years, with Woodside and Shell evaluating multiple FLNG concepts before COVID-related deferrals. The Browse FLNG project — if sanctioned — could involve one of the largest FLNG deployments yet attempted, potentially using two or three FLNG vessels moored above the field complex.
FLNG technology has progressed from an ambitious concept to a proven commercial reality in a remarkably short time, driven by the combined investment and engineering effort of Shell, Eni, TechnipFMC, Samsung Heavy Industries, and a host of specialist technology providers. The key lessons from Prelude and Coral Sul — about the importance of operational simplicity, the benefits of modular and standardised design, and the value of learning-by-doing in a genuinely novel technology application — will shape the next generation of FLNG projects as the concept matures and its economics are refined by operational experience.