- East Africa holds substantial natural gas resources — particularly in Tanzania’s Ruvuma and Mandawa basins and Kenya’s Lamu Basin — but monetisation has focused overwhelmingly on LNG export, while the region’s energy poverty crisis creates a compelling domestic gas-to-power opportunity that remains dramatically underserved.
- The East African Community (EAC) grid integration project — connecting the national electricity grids of Tanzania, Kenya, Uganda, Rwanda, Burundi, and South Sudan — creates a regional power market that could substantially increase the demand for gas-fired power generation and make the economics of domestic gas infrastructure much more attractive.
- Small-scale LNG and compressed natural gas (CNG) distribution — trucking or piping gas from production areas to power plants and industrial consumers — represents the most immediately deployable solution for bringing East African gas to domestic users while the larger infrastructure debate continues.
The Energy Poverty Context
East Africa has an energy poverty problem that is simultaneously extreme and largely invisible in global energy policy discussions dominated by European and Asian demand. Less than 50% of Tanzania’s population has access to electricity. Kenya is better positioned at around 75% electrification, but the quality of supply — voltage stability, frequency regulation, and reliability — remains poor by international standards, and many industrial and commercial users rely on diesel generators as backup. Uganda’s electrification rate is below 50%, and across the broader EAC region, hundreds of millions of people lack reliable electricity access.
The consequences extend beyond household inconvenience. Unreliable and expensive electricity is one of the primary constraints on industrialisation across East Africa — it prevents the establishment of energy-intensive manufacturing industries that have driven economic development in Asia and are potentially replicable in Africa. The economic cost of “load shedding” — deliberate rolling blackouts to manage insufficient generation capacity — runs into billions of dollars annually across the region.
Natural gas-fired power generation has obvious potential to address this deficit. Gas turbines and combined cycle plants can be built and operated reliably, can respond quickly to load variations, and produce far less local air pollution than coal or diesel alternatives. The question is whether the gas can be economically connected to the power generation demand centres.
Tanzania’s Gas Resources and the Domestic Allocation Challenge
Tanzania holds gas resources estimated at 40-57 tcf in the offshore Ruvuma and Mandawa basins — the same geological province as Mozambique’s Rovuma Basin discoveries. The fields offshore southern Tanzania, including Zafarani, Lavani, Mzia, and Jodari (all in Block 1 and Block 4, operated by Shell and Equinor respectively), contain gas volumes sufficient to support both LNG export and substantial domestic use for decades.
The Tanzanian government has maintained a domestic gas policy that requires a proportion of any gas production to be allocated for domestic use before export is permitted. This “domestic market obligation” (DMO) has been a consistent feature of Tanzanian gas policy but has also been a complicating factor in attracting LNG investment from international companies who want certainty about export volumes and pricing. The DMO creates tension between domestic development objectives and the export-oriented economics of IOC LNG investment.
The existing onshore gas infrastructure — the Natural Gas Pipeline (TAZAMA) and the Mtwara-Dar es Salaam gas pipeline that started operation in 2015 — has brought gas from the Mnazi Bay onshore field to Dar es Salaam for power generation. This infrastructure currently supplies approximately 500 MW of gas-fired power generation capacity in Dar es Salaam, representing a small fraction of the country’s generation mix but demonstrating that gas-to-power infrastructure is operationally feasible in Tanzania.
Kenya’s Lamu Basin and Offshore Potential
Kenya’s offshore gas was discovered primarily in the Lamu Basin — a deepwater basin off Kenya’s northern coast. Eni’s discovery of the Mamba gas field complex across the maritime boundary between Kenya and Tanzania demonstrated the northward extension of the Mozambique-Tanzania gas play fairway into Kenyan waters. Shell, Anadarko (now Occidental), and other operators have held exploration licences in the Kenyan offshore, though the development of Kenyan offshore gas for domestic use has faced similar delays to the broader East African LNG story.
Kenya’s onshore Bogoria-Silali geothermal province offers a different energy supply story — the country has developed substantial geothermal generation capacity that provides baseload power from the Olkaria complex in the Rift Valley. Kenya’s electricity mix is among the greenest in sub-Saharan Africa, with geothermal, hydro, and wind providing over 90% of grid power in good hydrological years. The challenge is that hydrological variability — drought years reduce hydro output significantly — creates supply reliability problems that gas-fired peaking capacity could address.
Small-Scale LNG and CNG: The Pragmatic Solution
While the infrastructure debate about major gas pipelines and LNG export terminals continues, small-scale LNG distribution offers a pragmatic near-term solution for domestic gas monetisation. Liquefying gas at the production site in small-scale liquefaction units (0.1-1 mtpa capacity) and trucking it in ISO LNG containers to distributed power plants and industrial users can bypass the capital requirement for major pipeline infrastructure — and it’s deployable on a timeline of months rather than years.
Tanzania’s TPDC (Tanzania Petroleum Development Corporation) and several international partners have evaluated small-scale LNG distribution schemes connecting Tanzanian offshore gas to domestic industrial and power consumers along the coast and inland. The economic viability depends on the delivered gas price to end users — competing against diesel in East Africa, where diesel generators are the current alternative for many users, small-scale LNG economics can work at moderate logistics costs.
The EAC Grid Integration Opportunity
The East African Community’s Power Master Plan envisions a cross-border transmission network linking all EAC member states, creating a regional power pool that allows surplus generation capacity in one country to serve demand in another. This vision — analogous to the European interconnected grid that enables the efficient utilisation of diverse renewable and conventional generation resources — would dramatically expand the effective market for East African gas-fired power generation.
A gas-fired power plant in coastal Tanzania, supplied from offshore gas, could export electricity to land-locked Rwanda, Burundi, or Uganda via an integrated regional grid — making the economics of the gas plant more favourable through higher utilisation and reducing the isolation of individual national markets. Several cross-border interconnectors are already under construction or in planning: Tanzania-Kenya, Tanzania-Zambia, and Kenya-Ethiopia HV transmission links are the most advanced.
The EAC grid vision is long-term and requires sustained political cooperation and capital investment, but the direction is established. For East African gas development, the prospect of a 250 million-person regional power market rather than individual national markets changes the economics of domestic gas infrastructure investment fundamentally — and could ultimately be the catalyst that makes gas-to-power the primary monetisation route for East African resources, rivalling or even supplanting LNG export as the development priority.