Key Takeaways:

  • Sub-Saharan Africa contains over 600 trillion cubic feet of proven natural gas reserves — primarily in Mozambique, Tanzania, Nigeria, and South Africa — much of which remains undeveloped due to infrastructure deficits, financing gaps, and geopolitical instability in key producing regions.
  • The gas-to-power model — using domestic natural gas as fuel for new power generation capacity to address Africa’s chronic electricity deficit — represents a more immediate economic benefit pathway than export-focused LNG development, but requires simultaneous investment in gas processing, transmission, and power plant infrastructure.
  • East Africa’s offshore gas discoveries in Tanzania’s deep-water Rovuma Basin — operated by Equinor, Shell, and other partners — and Mozambique’s Cabo Delgado LNG developments represent the continent’s most significant undeveloped gas resources, with combined reserves exceeding 200 trillion cubic feet.

Africa’s Gas Resource Endowment and the Energy Poverty Context

Africa is simultaneously one of the world’s most hydrocarbon-endowed continents and the region where energy poverty is most acute. Approximately 600 million people in Sub-Saharan Africa lack access to electricity — roughly half the continent’s population — and hundreds of millions more have access to electricity that is intermittent, expensive, and unreliable, placing enormous constraints on economic productivity, healthcare delivery, education, and quality of life. The continent’s natural gas reserves, if properly developed and converted to electricity at an appropriate scale, could materially address this deficit — yet the gap between resource endowment and actual electricity access remains vast.

The reasons for this gap are multiple and interacting. Financing for large gas-to-power infrastructure in Sub-Saharan Africa is difficult to secure: international banks and capital markets require creditworthy offtakers (power utilities or governments that will purchase the electricity), stable regulatory and legal frameworks that protect private investors’ returns, and risk mitigants against the currency convertibility, political risk, and counterparty default risks that are elevated in many African markets relative to OECD peers. The infrastructure deficit itself is a constraint — gas-to-power projects require not just the gas production facility and the power plant, but the pipeline infrastructure to connect them and the transmission and distribution infrastructure to deliver the electricity to consumers. In many African countries, the entire chain from gas field to end consumer must be built essentially from scratch.

Tanzania: The Promise of Block 1, 2, 3, and 4

Tanzania’s offshore Rovuma Basin — in deep water north of Mozambique’s corresponding Rovuma discoveries — contains an estimated 57 trillion cubic feet of gas in the Equinor-operated blocks (formerly Shell and Ophir Energy) and additional resources in the PAZA complex. Equinor’s Tanzania LNG project — proposed to liquefy gas from the Blocl 2 discoveries for export — has been in protracted negotiation with the Tanzanian government over the terms of the Host Government Agreement for many years, reflecting the complexity of structuring a project of this scale in a country with limited LNG development experience and government ambitions that extend beyond export revenues to include domestic gas supply commitments, local content requirements, and state company participation terms.

The Tanzania government’s priority for domestic gas supply — using offshore gas to fuel power plants, fertiliser plants, and industrial facilities that directly benefit the Tanzanian economy and citizens — creates tension with the economics of large-scale LNG export, which requires very large minimum volumes and extended commitment periods to justify the capital cost of liquefaction infrastructure. Balancing these competing priorities — domestic use versus export, near-term revenue versus long-term maximisation — is one of the most complex policy challenges for Tanzania’s government, with implications for the timeline of any Tanzania LNG development decision.

Mozambique: Coral Sul and the Cabo Delgado Security Crisis

Mozambique’s gas story encompasses the full range of opportunities and challenges that characterise African resource development. The country’s Rovuma Basin offshore resources — primarily developed by Eni (Area 4, including the Coral Sul FLNG) and TotalEnergies (Area 1, including the Mozambique LNG project) — represent one of the world’s largest LNG development opportunities, with combined reserves and resources estimated at over 100 trillion cubic feet. The Coral Sul FLNG — a floating liquefaction vessel moored above the Coral South gas field, producing the world’s first deepwater FLNG in Africa — has been producing and exporting LNG since 2022, demonstrating the technical viability of deepwater FLNG in challenging conditions.

TotalEnergies’ much larger Mozambique LNG project — an onshore liquefaction facility at Afungi Peninsula in Cabo Delgado province, designed to produce 13.1 million tonnes per annum from the Golfinho-Atum discovery — has been effectively halted since April 2021 when TotalEnergies declared force majeure following a jihadist insurgency attack on the town of Palma that killed dozens of people and forced the evacuation of thousands. The attack, attributed to militants linked to the Islamic State (IS-Mozambique), demonstrated the vulnerability of large energy infrastructure projects in areas affected by armed insurgency and raised fundamental questions about the security conditions required for a project of this scale to be safely executed. The insurgency in Cabo Delgado has continued, with Rwandan military forces and the Southern African Development Community (SADC) mission providing security support, and TotalEnergies periodically evaluating conditions against the threshold required to resume construction.

Nigeria: Gas Flaring and the Domestic Gas Challenge

Nigeria holds Africa’s largest natural gas reserves — estimated at approximately 190 trillion cubic feet — and is an established LNG exporter through the Nigeria LNG (NLNG) facility at Bonny Island, which produces approximately 22 million tonnes per annum from six trains and is considering a seventh train expansion. Despite these resources, Nigeria faces a profound irony: it flares more natural gas than almost any other country in the world — approximately 7 to 10 billion standard cubic feet per day are burned at the wellhead as unwanted associated gas from oil production — while simultaneously facing severe domestic gas supply shortages that leave its gas-fired power stations chronically underperforming and millions of citizens without reliable electricity.

The gas flaring problem reflects a combination of infrastructure inadequacy (insufficient gas gathering and processing infrastructure to capture associated gas from oilfields distributed across the Niger Delta), commercial framework inadequacy (oil companies historically had limited commercial incentive to invest in gas infrastructure if the gas could not be profitably monetised), and governance challenges in a gas market where domestic gas prices have historically been regulated at levels below the cost of supply, discouraging investment in the infrastructure needed to deliver gas to domestic users. The Nigerian government’s Decade of Gas Initiative — announced in 2021 and targeting a transition from gas flaring to domestic gas utilisation as the primary driver of economic development and power generation — represents a political commitment to addressing these issues, but progress has been slow against the structural challenges involved.

The Gas-to-Power Investment Framework: What Works

The most successful African gas-to-power projects share a number of structural features that distinguish them from failed or stalled attempts. First, the gas supply and power off-take are structured as integrated contracts — the same counterparty or linked counterparties guarantee both the gas purchase and the power purchase, eliminating the “missing link” problem where gas is available but no creditworthy buyer exists for the electricity, or vice versa. Second, the project is backed by multilateral financial institution (MFI) support — from the World Bank Group’s IFC and MIGA, the African Development Bank, and the US International Development Finance Corporation (DFC) — which provides political risk insurance and preferential financing terms that reduce the cost of capital and provide a measure of protection against regulatory or political interference. Third, the regulatory framework — power purchase agreement terms, gas supply terms, tariff setting mechanisms, and repatriation of profits and loan repayments — is established under transparent, internationally recognised legal frameworks that give private investors genuine confidence in the enforceability of their contractual rights.

South Africa’s gas import and gas-to-power programme — driven by the chronic shortage of domestic gas supply and the crisis in Eskom’s coal-fired generation capacity that has caused crippling load-shedding across the country — is one of the most significant new African gas-to-power markets emerging in the mid-2020s. The Coega FSRU terminal in the Eastern Cape and proposals for a West Coast FSRU or pipeline import facility reflect South Africa’s desperate need for additional generation capacity and the government’s recognition that natural gas — whether sourced domestically from the Southern Cape Karoo shale potential or from imports — is the most immediately available source of flexible generation capacity to complement the solar and wind renewables being rapidly deployed under the REIPPP (Renewable Energy Independent Power Producer Programme).

Africa’s gas-to-power opportunity is real, substantial, and urgently needed. The continent’s electricity deficit is not merely an economic inconvenience; it is a direct constraint on human development, health outcomes, and quality of life for hundreds of millions of people. Natural gas — cleaner than coal, more reliable than intermittent renewables without storage, and available in enormous quantities beneath Africa’s offshore basins — has the potential to transform the continent’s energy access situation in the next two decades. Unlocking that potential requires the same combination of political stability, commercial framework design, and financial innovation that has enabled successful gas-to-power projects globally — applied to the specific institutional and infrastructural contexts of individual African markets. It is achievable; the question is whether the political will and the investment community’s patience will sustain through the inevitable difficulties of execution.